Customization: | Available |
---|---|
Certification: | ISO9001 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ZOOMLION truck crane ZTC250V451.1
1, 4 sections with a maximum length of 35 meters U-shaped main boom, the maximum lifting moment of the basic boom is 960kN · m, the maximum lifting moment of the full extension boom is 672kN · m, and the maximum lifting weight of the full extension boom is 8t.
2. The three-bridge heavy truck crane chassis platform has strong load-bearing capacity, good passability, mobility, and driving reliability. The chassis meets the standard requirements for G vehicles, without front and lower protection devices.
3. Fully upgraded control performance, slewing load-sensitive system, and the initial use of large displacement variable motor, perfect balance of working speed, smooth operation and micro-movement.
4. Low operating cost. The quadruple pump and variable motor are used to reduce the operating fuel consumption by more than 10%. The WP7 engine and 9-speed transmission are used to optimize the powertrain matching and reduce driving fuel consumption by 10%.
5. A comprehensive on-board information platform to realize three-dimensional monitoring of equipment operation.
6, green environmental protection and stylish texture of the new paint, new two-room design, humanized detail design, with a panoramic wide-body control room, convenient and safe operation experience.
Main configeration:
Full drive, three axles, single reduction drive axle, Weichai Euro V (199kW), four U-shaped main boom (10.7 ~ 35) m, one jib (8m), double hoist, dual variable motor, get on and off Heating and air-conditioning, five outriggers, two-sided operation of the legs, manual operation, 25t main hook, 3t auxiliary hook.
ITEM |
|
REMARKS |
||
WORKING ABILITY |
Vehicle kerb mass |
kg |
25000 |
|
Lifting moment of basic boom |
kN.m |
960 |
|
|
Lifting moment of longest boom |
kN.m |
672 |
|
|
Maximum lifting height of basic arm |
m |
11.4 |
|
|
Maximum lifting height of main boom |
m |
35.4 |
Disregarding boom deformation |
|
Jib lifting height |
m |
43.0 |
||
WORKING SPEED |
Maximum single rope speed (main winch) |
m/min |
120 |
Fourth layer |
Maximum single rope speed (sub winch) |
m/min |
120 |
Fourth Layer | |
Boom lifting time |
s |
25 |
|
|
Boom extension time |
s |
64 |
|
|
SWING SPEED |
r/min |
0~3 |
|
|
DRIVING |
Maximum use altitude |
m |
2000 |
|
Max speed |
km/h |
85 |
|
|
Gradeability |
% |
42 |
|
|
Minimum turning diameter |
m |
≤20 |
|
|
Minimum ground clearance |
mm |
260 |
|
|
Fuel consumption per hundred kilometers |
L |
28 |
|
|
QUALITY |
Driving weight (total weight) |
kg |
29600 |
|
Vehicle quality |
kg |
29470 |
|
|
Front axle capacity |
kg |
6300 |
|
|
Rear axle capacity |
kg |
23300 |
|
|
DIMENSION |
Overall dimension |
mm |
13100×2500×3450 |
|
Outrigger distance |
m |
5.40 |
|
|
Outrigger lateral distance |
m |
All 6.2, semi 4.25 |
|
|
Tail turning radius |
mm |
3265 |
|
|
Main boom |
m |
10.7~35.0 |
|
|
Boom elevation |
° |
-2~80 |
|
|
Jib |
m |
8 |
|
|
Jib mounting angle |
° |
0,15,30 |